Product Details:
Payment & Shipping Terms:
|
Technique: | Forged, Hot Rolled | Alloy Or Not: | Alloy |
---|---|---|---|
Application: | H13 Hot Work Tool Steel | Standard: | ASTM, DIN, GB, JIS, AISI, BS |
Steel Grade: | 1.2344, H13, SKD61 | Type: | Hot Work Tool Steel |
Special Use: | Mold Steel, Free Cutting Steel | Thickness: | 16-260mm |
Shape: | Round Bar, Flat Bar | Product Name: | Hot Forged ESR Hot Work Plastic Tool Steel With Hardness (1.2344 H13 SKD61) |
Delivery Condition: | Hot Forged +Rough Machined (black Surface, Annealed | Ut Test Standard: | SEP1921-84 Class3 C/c To D/d |
Length: | 3000-6000mm | Surface: | Black Surface Or Machined |
Production Route: | EF/EAF+LF+VD/ESR | Certification: | ISO9001, ISO 9001 |
Width: | 205-610mm | ||
High Light: | international tool steel,hot work die steel |
Die-casting mould for aluminum, extrusion mould, and thin-wall plastics mould.
1.2344 modified high roughness high isotropy hot work die steel and HSSD2344 steel have good thermal stability and thermal fatigue resistance.
It can displace imported senior high quality hot work die steels such as 1.2344/AISI H13.Etc.
Applications
It can displace imported die steels such as AISI H13, widely used in die casting mold, hot extruding die, brass casting die, high strength plastic die etc.
Feature
Electro slag remelting, annealing with diffusion process and ultrafiningheat- treatment has good microstructual homogeneity and finer dispersed carbides.
High isotropy, aspect rations≥0.8
Good tempering performance, high toughness, high temperature strength, good thermal stability and thermal fatigue resistance.
Hardness
Annealing hardness | Quenching hardness | Tempering hardness |
≤230HB, | 51-55HRC | 46-50HRC |
Technical service
Die vacuum heat treatment and die surface treatment (N-O,C-N, carburize and nitridation surface treatment).
Chemical composition
C | Si | Mn | P | S | Cr | Mo | V |
0.35-0.40 | 1.00-1.20 | 0.40-0.60 | ≤0.015 | ≤0.003 | 4.80-5.20 | 1.20-1.40 | 0.80-1.00 |
Recommend heat treatment
Heating temperature | Cooling way | Hardness (HRC) | Tempering temperature /ºC |
Tempering number | Hardness (HRC) |
||
First preheating | Second preheating | Last heating | |||||
500- 600 |
820- 860 |
1010- 1040 |
Oil cooling | 53-55 | 560-620 | 2 | 50-46 |
Port of loding: Shenzhen China
Terms of Payment:30% Deposit,Blance by L/C at Sight or T/T
Delivery time: For abundant stock, 15-20 days.For customized products, 30-50 days.
Product Display
Loading
After years of development, the company has established a complete quality management and export service system. We have a group of experienced and competent elites and is capable of offering the best service to clients. Our company equips with large-sized Vertical saw machines, Horizontal saw machines, Milling machines, Grinding machines and other advanced equipments to provide customers with cutting and other processing services. All the products should be inspected the metallographic analysis, hardness, ultrasonic flaw detection and other strict inspection processes, which meet the standards of DIN, AISI, JIS and GB to ensure their function and quality.
FAQ
Q: Are you a manufacturer or merely a trader?
A: We are trading company act as exporting Steel Products with our own factory,
we can manufacture the products as in cutomer's requirement,wholesale and retail all kinds of domestic mould steel,the price we offered is very competitive compared with other agents.
Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party, such as SGS, CE,ISO if you need. Secondly, we have a complete set of inspection system and every process is checked by QC. Quality is the lifeline of enterprise survival. Third,the products we export are mainly from ShaGang group, WenFeng group, XingCheng group, DongTe group,DaYe and so on, the quality are certained.
Q: Delivery time?
A: We have ready stock for most of material grades in our warehouse. If the material don't have stock, the delivery lead time is about 30-50 days after receiving your prepayment or firm order.
Q: What is the payment term?
A:100% T/T or 30%T/T deposite prepaid, 70%Balance L/C
Q: Can we visit your company and factory?
A: Yes, warmly welcome! We can book the hotel for you before you come to China and arrange our driver to our airport to pick you up when you come.
Contact Person: Echo
Tel: +86 18148729336
Fax: +86-020-8251-5866